EV charging site
Roper Yard
20 Roper Road, Canterbury, CT2 7ER
Roper Yard is an EV charging site in Canterbury, Kent. It has a single 7 kW Type 2 socket. 14 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Canterbury Lane (POGO), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Customers only
- Phone (from Open Charge Map)
- 07968810638
- Notes
- The point is a 13 amp 3 pin and a fast 7 point mennekes,Cost includes parking in central Canterbury, another charge point being fitted soon
- Getting there
- Access to roper yard is a small archway under 20 roper road, drive down and charge point is on your left outside unit 1a, phone or email in advance for the key, open 24/7 but key only available between 7.00am and 10.30 pm.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Roper Yard?
Up to 7 kW AC via Type 2.
How many charging sockets does Roper Yard have?
1 charging socket: 1 × 7 kW Type 2.
Can anyone charge at Roper Yard?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Roper Yard?
Canterbury Lane (POGO) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Roper Yard?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Roper Yard?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Roper Yard?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Multi-Storey Car Park
- Beverley Road
- Queens Avenue
- Westgate Hall Road
- Ev Dot Watling Street Car Park
- Canterbury Lane
- Cheapest nearby
- Canterbury Lane · 56p per kWh · 50 kW · 0.6 mi
- Fastest nearby
- Canterbury Lane · 50 kW · 0.6 mi