Project EV · EV charging site
Greenhead Hotel & Hostel LLP
A69, Greenhead, CA8 7HG
Greenhead Hotel & Hostel LLP is an EV charging site in Greenhead, Northumberland, run by Project EV. It has a single 7 kW Type 2 socket, and the price is listed as Chargeable. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Railway Station Car Park (BP Pulse), 2.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Project EV
- Opening hours
- Not published
- Access
- Public
- Price
- Chargeable(from Open Charge Map, 5 Apr 2026)
- Phone (from Open Charge Map)
- 0800 599 9582
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Greenhead Hotel & Hostel LLP (Project EV)?
The listed price is Chargeable. Prices can change, so check the price at the charger before you start.
How fast is charging at Greenhead Hotel & Hostel LLP (Project EV)?
Up to 7 kW AC via Type 2.
How many charging sockets does Greenhead Hotel & Hostel LLP (Project EV) have?
1 charging socket: 2 × 7 kW Type 2.
Who operates Greenhead Hotel & Hostel LLP?
Greenhead Hotel & Hostel LLP is on the Project EV network. For site issues, the operator lists 0800 599 9582.
Where is the nearest charger with 50 kW or more to Greenhead Hotel & Hostel LLP (Project EV)?
Railway Station Car Park (BP Pulse) is 2.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Greenhead Hotel & Hostel LLP (Project EV)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Greenhead Hotel & Hostel LLP (Project EV)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Greenhead Hotel & Hostel LLP (Project EV)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Walltown Quarry Country Park
- Northumberland National Park
- Bush Nook Guest House
- Haltwhistle leisure pool
- Railway Station Car Park
- Park View Car Park 1, West Gate, Haltwhisle
- Cheapest nearby
- Railway Station Car Park · 89p per kWh · 50 kW · 2.9 mi
- Fastest nearby
- Railway Station Car Park · 50 kW · 2.9 mi