Scottish Power · EV charging site
Cattle Market Car Park
Holland Street, Barnstaple, EX31 1HX
Cattle Market Car Park is an EV charging site in Barnstaple, Devon, run by Scottish Power. Both of its sockets are 22 kW Type 2. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Barnstaple Central Car Park, Barnstaple (Osprey Charging), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Scottish Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.35/kWh. Parking charges apply.(from Open Charge Map, 3 Oct 2022)
- Notes
- Contactless payment terminal fitted
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Cattle Market Car Park (Scottish Power)?
The listed price is £0.35/kWh. Parking charges apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Cattle Market Car Park (Scottish Power)?
Up to 22 kW AC via Type 2.
How many charging sockets does Cattle Market Car Park (Scottish Power) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Cattle Market Car Park?
Cattle Market Car Park is on the Scottish Power network.
Where is the nearest charger with 50 kW or more to Cattle Market Car Park (Scottish Power)?
Barnstaple Central Car Park, Barnstaple (Osprey Charging) is 0.2 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cattle Market Car Park (Scottish Power)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cattle Market Car Park (Scottish Power)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cattle Market Car Park (Scottish Power)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Barnstaple Central Car Park, Barnstaple
- Belle Meadow Car Park, Barnstaple
- Pod Point Tesco Extra - Barnstaple Taw View
- Esso Garage Barnstaple
- McDonald's Barnstaple
- County Renault Barnstaple
- Cheapest nearby
- Pod Point Tesco Extra - Barnstaple Taw View · 44.4p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- Barnstaple Central Car Park, Barnstaple · 300 kW · 0.2 mi