Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Shell Recharge · EV charging site

Shell Recharge EV Aldi Ashby-de-la Zouch

Aldi Dents Road, Coalville, LE65 1JS

Shell Recharge EV Aldi Ashby-de-la Zouch is an EV charging site in Coalville, Leicestershire, run by Shell Recharge and open 24 hours a day. All 4 of its sockets are 50 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 170 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Extra - Ashby De La Zouch, 0.2 miles away.

Status

2 of 4 available

Checking status…

VerifiedLive status and details from Shell Recharge’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW4 connectors · 89p per kWh2 free2 in use
01100% reliabilityAvailable
02100% reliabilityBlocked
03100% reliabilityCharging
04100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Payment
In the Shell app
Charger ID
01

Facilities

SupermarketAldi

Always check directly with the charge point operator for the most up-to-date information.

Prices

89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Shell Recharge EV Aldi Ashby-de-la Zouch?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Shell Recharge EV Aldi Ashby-de-la Zouch?

Up to 50 kW DC via CCS.

How many charging sockets does Shell Recharge EV Aldi Ashby-de-la Zouch have?

4 charging sockets: 4 × 50 kW CCS. Live per-socket availability is shown on this page.

Is Shell Recharge EV Aldi Ashby-de-la Zouch open 24/7?

Yes - Shell Recharge EV Aldi Ashby-de-la Zouch is open 24 hours a day, 7 days a week.

When is Shell Recharge EV Aldi Ashby-de-la Zouch busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Shell Recharge EV Aldi Ashby-de-la Zouch?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 170 observed charging sessions.

Who operates Shell Recharge EV Aldi Ashby-de-la Zouch?

Shell Recharge EV Aldi Ashby-de-la Zouch is on the Shell Recharge network.

Where is the nearest other charger with 50 kW or more to Shell Recharge EV Aldi Ashby-de-la Zouch?

Pod Point Tesco Extra - Ashby De La Zouch is 0.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Shell Recharge EV Aldi Ashby-de-la Zouch?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shell Recharge EV Aldi Ashby-de-la Zouch?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Shell Recharge EV Aldi Ashby-de-la Zouch?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Shell Recharge · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.