Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Shell Recharge · EV charging site

Shell Recharge Shell Whichers Gate

Rowlands Castle, Havant, PO9 6BB

Shell Recharge Shell Whichers Gate is an EV charging site in Havant, Hampshire, run by Shell Recharge and open 24 hours a day. All 4 of its sockets are 400 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 285 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Heron (Havant) (evyve), 1.3 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from Shell Recharge’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 400 kW4 connectors · 89p per kWh4 free
01-1100% reliabilityAvailable
01-2100% reliabilityAvailable
02-1100% reliabilityAvailable
02-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Payment
In the Shell app
Charger ID
01-1

Facilities

Fuel stationShop

Always check directly with the charge point operator for the most up-to-date information.

Prices

89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 400 kW CCS~21 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 400 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 400 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 400 kW CCS~18 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 400 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 400 kW CCS~39 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Shell Recharge Shell Whichers Gate?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Shell Recharge Shell Whichers Gate?

Up to 400 kW DC via CCS.

How many charging sockets does Shell Recharge Shell Whichers Gate have?

4 charging sockets: 4 × 400 kW CCS. Live per-socket availability is shown on this page.

Is Shell Recharge Shell Whichers Gate open 24/7?

Yes - Shell Recharge Shell Whichers Gate is open 24 hours a day, 7 days a week.

When is Shell Recharge Shell Whichers Gate busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Shell Recharge Shell Whichers Gate?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 285 observed charging sessions.

Who operates Shell Recharge Shell Whichers Gate?

Shell Recharge Shell Whichers Gate is on the Shell Recharge network.

Where is the nearest other charger with 50 kW or more to Shell Recharge Shell Whichers Gate?

Heron (Havant) (evyve) is 1.3 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Shell Recharge Shell Whichers Gate?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shell Recharge Shell Whichers Gate?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Shell Recharge Shell Whichers Gate?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Shell Recharge · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.