GeniePoint · EV charging site
Morrisons Horndean
Lakesmere Road, Waterlooville, PO8 9FB
Morrisons Horndean is an EV charging site in Waterlooville, Hampshire, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Waterlooville Service Station (InstaVolt Ltd), 2.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh. £10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins(from Open Charge Map, 24 Aug 2019)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons Horndean (GeniePoint)?
The listed price is £1.00 + £0.30/kWh. £10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins. Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons Horndean (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Morrisons Horndean (GeniePoint) have?
1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Morrisons Horndean?
Morrisons Horndean is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Horndean (GeniePoint)?
Waterlooville Service Station (InstaVolt Ltd) is 2.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Horndean (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Horndean (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Horndean (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ICEE Office
- BeWorks Test Team
- Waterlooville Service Station
- Shell Recharge Shell Whichers Gate
- Wellington Way Car Park
- Yeomans Nissan
- Cheapest nearby
- Shell Recharge Shell Whichers Gate · 89p per kWh · 400 kW · 2.2 mi
- Fastest nearby
- Shell Recharge Shell Whichers Gate · 400 kW · 2.2 mi