Silverstone Green Energy · EV charging site
Church Road Car Park, New Quay
Church Road, New Quay, SA45 9PB
Church Road Car Park, New Quay is an EV charging site in New Quay, County of Ceredigion, run by Silverstone Green Energy. Both of its sockets are 22 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Car Park off Teras-Yr_Osaf Llanybydder (Evolt), 12.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Church Road Car Park, New Quay (Silverstone Green Energy)?
Up to 22 kW AC via Type 2.
How many charging sockets does Church Road Car Park, New Quay (Silverstone Green Energy) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Church Road Car Park, New Quay?
Church Road Car Park, New Quay is on the Silverstone Green Energy network.
Where is the nearest charger with 50 kW or more to Church Road Car Park, New Quay (Silverstone Green Energy)?
Car Park off Teras-Yr_Osaf Llanybydder (Evolt) is 12.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Church Road Car Park, New Quay (Silverstone Green Energy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Church Road Car Park, New Quay (Silverstone Green Energy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Church Road Car Park, New Quay (Silverstone Green Energy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.