Silverstone Green Energy · EV charging site
Greenfield Square Car Park Cardigan
Greenfield Square, Cardigan, SA43 1JU
Greenfield Square Car Park Cardigan is an EV charging site in Cardigan, County of Ceredigion, run by Silverstone Green Energy. Its 2 sockets reach up to 60 kW, with Type 2 at the top speed. 4 other charging sites are listed within a mile, and no other site with 50 kW or more is listed within 15 miles.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Greenfield Square Car Park Cardigan (Silverstone Green Energy)?
Up to 60 kW DC via Type 2, CHAdeMO.
How many charging sockets does Greenfield Square Car Park Cardigan (Silverstone Green Energy) have?
2 charging sockets: 1 × 60 kW Type 2, 1 × 50 kW CHAdeMO.
Who operates Greenfield Square Car Park Cardigan?
Greenfield Square Car Park Cardigan is on the Silverstone Green Energy network.
Where is the nearest other charger with 50 kW or more to Greenfield Square Car Park Cardigan (Silverstone Green Energy)?
Amp Map lists no other site with 50 kW or more within 15 miles in a straight line.
How long does a Tesla Model Y Long Range take to charge at Greenfield Square Car Park Cardigan (Silverstone Green Energy)?
A typical 10–80% rapid charge takes about 58 min on the 60 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Greenfield Square Car Park Cardigan (Silverstone Green Energy)?
A typical 10–80% rapid charge takes about 43 min on the 60 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Greenfield Square Car Park Cardigan (Silverstone Green Energy)?
A typical 10–80% rapid charge takes about 57 min on the 60 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fairfields Car Park
- Cardigan Leisure Centre
- Pod Point Tesco Superstore - Cardigan
- High Street Car Park
- Poppit Sands Car Park, Poppit Sands
- Hammet House
- Cheapest nearby
- Pod Point Tesco Superstore - Cardigan · 44.4p per kWh · 7 kW · 0.7 mi