Silverstone Green Energy · EV charging site
Poppit Sands Car Park, Poppit Sands
St. Dogmaels, Cardigan, SA43 3LN
Poppit Sands Car Park, Poppit Sands is an EV charging site in Cardigan, County of Ceredigion, run by Silverstone Green Energy. Both of its sockets are 22 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Greenfield Square Car Park Cardigan (Silverstone Green Energy), 2.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Poppit Sands Car Park, Poppit Sands (Silverstone Green Energy)?
Up to 22 kW AC via Type 2.
How many charging sockets does Poppit Sands Car Park, Poppit Sands (Silverstone Green Energy) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Poppit Sands Car Park, Poppit Sands?
Poppit Sands Car Park, Poppit Sands is on the Silverstone Green Energy network.
Where is the nearest charger with 50 kW or more to Poppit Sands Car Park, Poppit Sands (Silverstone Green Energy)?
Greenfield Square Car Park Cardigan (Silverstone Green Energy) is 2.1 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Poppit Sands Car Park, Poppit Sands (Silverstone Green Energy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Poppit Sands Car Park, Poppit Sands (Silverstone Green Energy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Poppit Sands Car Park, Poppit Sands (Silverstone Green Energy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- High Street Car Park
- Greenfield Square Car Park Cardigan
- Cardigan Leisure Centre
- Fairfields Car Park
- Pod Point Tesco Superstore - Cardigan
- Cheapest nearby
- Pod Point Tesco Superstore - Cardigan · 44.4p per kWh · 7 kW · 2.5 mi
- Fastest nearby
- Greenfield Square Car Park Cardigan · 60 kW · 2.1 mi