Silverstone Green Energy · EV charging site
Llanion Park H.Q - Front, Pembroke Dock
Llanion Park, Pembroke Dock, SA72 6DY
Llanion Park H.Q - Front, Pembroke Dock is an EV charging site in Pembroke Dock, Pembrokeshire, run by Silverstone Green Energy. Both of its sockets are 50 kW Type 2 and CHAdeMO. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Western Way Car Park, Pembroke Dock (Silverstone Green Energy), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Llanion Park H.Q - Front, Pembroke Dock (Silverstone Green Energy)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Llanion Park H.Q - Front, Pembroke Dock (Silverstone Green Energy) have?
2 charging sockets: 1 × 50 kW Type 2, 1 × 50 kW CHAdeMO.
Who operates Llanion Park H.Q - Front, Pembroke Dock?
Llanion Park H.Q - Front, Pembroke Dock is on the Silverstone Green Energy network.
Where is the nearest other charger with 50 kW or more to Llanion Park H.Q - Front, Pembroke Dock (Silverstone Green Energy)?
Western Way Car Park, Pembroke Dock (Silverstone Green Energy) is 0.3 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Llanion Park H.Q - Front, Pembroke Dock (Silverstone Green Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Llanion Park H.Q - Front, Pembroke Dock (Silverstone Green Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Llanion Park H.Q - Front, Pembroke Dock (Silverstone Green Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Western Way Car Park, Pembroke Dock
- Gordon Street Car Park
- Pod Point Tesco Superstore - Pembroke Dock
- Y Cerrig Glas, Pembroke Dock
- Bridge Innovation Centre, Pembroke Dock
- Pembroke Dock Ferry Terminal
- Cheapest nearby
- Pod Point Tesco Superstore - Pembroke Dock · 44.4p per kWh · 50 kW · 0.3 mi
- Fastest nearby
- Western Way Car Park, Pembroke Dock · 120 kW · 0.3 mi