GeniePoint · EV charging site
Gordon Street Car Park
Gordon Street, Pembroke Dock, SA72 6DW
Gordon Street Car Park is an EV charging site in Pembroke Dock, Pembrokeshire, run by GeniePoint. All 4 of its sockets are 22 kW Type 2, and the price is listed as £0.85 + £0.25/kWh. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Western Way Car Park, Pembroke Dock (Silverstone Green Energy), 100 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.85 + £0.25/kWh(from Open Charge Map, 24 Jun 2019)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Gordon Street Car Park (GeniePoint)?
The listed price is £0.85 + £0.25/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Gordon Street Car Park (GeniePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Gordon Street Car Park (GeniePoint) have?
4 charging sockets: 4 × 22 kW Type 2.
Who operates Gordon Street Car Park?
Gordon Street Car Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to Gordon Street Car Park (GeniePoint)?
Western Way Car Park, Pembroke Dock (Silverstone Green Energy) is 100 yards away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Gordon Street Car Park (GeniePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gordon Street Car Park (GeniePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Gordon Street Car Park (GeniePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Western Way Car Park, Pembroke Dock
- Y Cerrig Glas, Pembroke Dock
- Pod Point Tesco Superstore - Pembroke Dock
- Llanion Park H.Q - Front, Pembroke Dock
- Pembroke Dock Ferry Terminal
- Bridge Innovation Centre, Pembroke Dock
- Cheapest nearby
- Pod Point Tesco Superstore - Pembroke Dock · 44.4p per kWh · 50 kW · 0.3 mi
- Fastest nearby
- Western Way Car Park, Pembroke Dock · 120 kW · 100 yd