SureCharge · EV charging site
Courter Road
Courter Road, Shepherds Bush, W6 0BJ
Courter Road is an EV charging site in Shepherds Bush, Greater London, run by SureCharge. It has a single 4 kW Type 2 socket. 1,616 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Rowan Road (Opp no. 5) (ESB Energy), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Courter Road (SureCharge)?
Up to 4 kW AC via Type 2.
How many charging sockets does Courter Road (SureCharge) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Courter Road?
Courter Road is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Courter Road (SureCharge)?
Rowan Road (Opp no. 5) (ESB Energy) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Courter Road (SureCharge)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Courter Road (SureCharge)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Courter Road (SureCharge)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Road Coulter, Junction Of Agate Road
- O/S no 40
- ubitricity Distributed Energy Systems UK Ltd. 40 O-S No, Agate Road
- ubitricity Distributed Energy Systems UK Ltd. 59 Agate Road, O S No 59
- Coulter Road
- ubitricity Distributed Energy Systems UK Ltd. Road Coulter, Junction Of Iffley Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Coulter, Junction Of Agate Road · 56p per kWh · 5 kW · 10 yd
- Fastest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Coulter, Junction Of Agate Road · 5 kW · 10 yd