SureCharge · EV charging site
Hammersmith Grove
Hammersmith Grove, Shepherds Bush, W6 0NQ
Hammersmith Grove is an EV charging site in Shepherds Bush, Greater London (W6 0NQ), run by SureCharge. It has a single 5 kW Type 2 socket. Amp Map lists 9 other charge points named Hammersmith Grove in Shepherds Bush. 1,644 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Rowan Road (Opp no. 5) (ESB Energy), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Hammersmith Grove (SureCharge)?
Up to 5 kW AC via Type 2.
How many charging sockets does Hammersmith Grove (SureCharge) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Hammersmith Grove?
Hammersmith Grove is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Hammersmith Grove (SureCharge)?
Rowan Road (Opp no. 5) (ESB Energy) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hammersmith Grove (SureCharge)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hammersmith Grove (SureCharge)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hammersmith Grove (SureCharge)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 108 Hammersmith Grove, O S No108 Opp Adie Rd
- ubitricity Distributed Energy Systems UK Ltd. 91 Hammersmith Grove, Outside 91
- ubitricity Distributed Energy Systems UK Ltd. 1-2 Adie Road, Opp 1 2
- ubitricity Distributed Energy Systems UK Ltd. 86 Hammersmith Grove, Outside 86
- Hammersmith Grove
- ubitricity Distributed Energy Systems UK Ltd. Road Agate, J O Adie Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 108 Hammersmith Grove, O S No108 Opp Adie Rd · 56p per kWh · 5 kW · 10 yd