GeniePoint · EV charging site
Aston Fields
St. Godwalds Road, Bromsgrove, B60 3BN
Aston Fields is an EV charging site in Bromsgrove, Worcestershire, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Aston Fields St. (GeniePoint), 60 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Aston Fields (GeniePoint)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Aston Fields (GeniePoint) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.
Who operates Aston Fields?
Aston Fields is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Aston Fields (GeniePoint)?
Aston Fields St. (GeniePoint) is 60 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Aston Fields (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Aston Fields (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Aston Fields (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Aston Fields St.
- Bromsgrove Park and Ride
- Basepoint Bromsgrove
- Morrisons Bromsgrove
- Arbury Nissan Bromsgrove
- Windsor Street Car Park
- Cheapest nearby
- Basepoint Bromsgrove · 59p per kWh · 25 kW · 0.6 mi