GeniePoint · EV charging site
Aztec West Business Park
Park Avenue, Mangotsfield, BS32 4TD
Aztec West Business Park is an EV charging site in Mangotsfield, South Gloucestershire, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 11 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is The Aztec Centre (GeniePoint), 80 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh; Overstay £10.00 every 90 minutes after 90 minutes(from Open Charge Map, 25 Oct 2021)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Getting there
- Ownership transferred to ChargePoint Services/GeniePoint.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Aztec West Business Park (GeniePoint)?
The listed price is £1.00 + £0.30/kWh; Overstay £10.00 every 90 minutes after 90 minutes. Prices can change, so check the price at the charger before you start.
How fast is charging at Aztec West Business Park (GeniePoint)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Aztec West Business Park (GeniePoint) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2, 2 × 22 kW Type 2.
Who operates Aztec West Business Park?
Aztec West Business Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Aztec West Business Park (GeniePoint)?
The Aztec Centre (GeniePoint) is 80 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Aztec West Business Park (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Aztec West Business Park (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Aztec West Business Park (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Aztec Centre
- Aztec Hotel & Spa
- IONITY GmbH IONITY Bristol North
- Gloucestershire FA
- Hollow Tree, Bristol
- The Parade Car Park
- Cheapest nearby
- IONITY GmbH IONITY Bristol North · 83.3p per kWh · 400 kW · 0.3 mi
- Fastest nearby
- IONITY GmbH IONITY Bristol North · 400 kW · 0.3 mi