GeniePoint · EV charging site
The Parade Car Park
Patchway, Mangotsfield, BS34 5JP
The Parade Car Park is an EV charging site in Mangotsfield, South Gloucestershire, run by GeniePoint. Both of its sockets are 22 kW Type 2. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Aztec West Business Park (GeniePoint), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Parade Car Park (GeniePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does The Parade Car Park (GeniePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates The Parade Car Park?
The Parade Car Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to The Parade Car Park (GeniePoint)?
Aztec West Business Park (GeniePoint) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Parade Car Park (GeniePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Parade Car Park (GeniePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Parade Car Park (GeniePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Aztec West Business Park
- The Aztec Centre
- Coniston Road Car Park
- Aztec Hotel & Spa
- IONITY GmbH IONITY Bristol North
- Gloucestershire FA
- Cheapest nearby
- IONITY GmbH IONITY Bristol North · 83.3p per kWh · 400 kW · 0.9 mi
- Fastest nearby
- IONITY GmbH IONITY Bristol North · 400 kW · 0.9 mi