GeniePoint · EV charging site
Chester Road Car Park
Chester Road, Neston, CH64 9PB
Chester Road Car Park is an EV charging site in Neston, Cheshire West and Chester, run by GeniePoint. Both of its sockets are 7 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Eastham Point, Birkenhead (Osprey Charging), 4.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Chester Road Car Park (GeniePoint)?
Up to 7 kW AC via Type 2.
How many charging sockets does Chester Road Car Park (GeniePoint) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Chester Road Car Park?
Chester Road Car Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to Chester Road Car Park (GeniePoint)?
Eastham Point, Birkenhead (Osprey Charging) is 4.5 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Chester Road Car Park (GeniePoint)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chester Road Car Park (GeniePoint)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Chester Road Car Park (GeniePoint)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Garden House Nurseries,
- Pod Point Thornton Hall Hotel - Neston Road
- Pod Point Tesco Superstore - Wirral
- EVC Macdonald Craxton Wood Hotel
- Castle Street
- Claremont Courtyard
- Cheapest nearby
- Pod Point Tesco Superstore - Wirral · 44.4p per kWh · 7 kW · 3.2 mi
- Fastest nearby
- EVC Macdonald Craxton Wood Hotel · 22 kW · 3.7 mi