GeniePoint · EV charging site
Church Green
Market Street, Keighley, BD21 5AD
Church Green is an EV charging site in Keighley, Bradford, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Keighley (GeniePoint), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- completely free to charge until October 2021 / Please register at : ev.engie.co.uk(from Open Charge Map, 27 Dec 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- Engie rapid charger, 50kW DC, AC is a 22 Kw Socket. One bay for general use, one bay for taxis. Both Free to charge. Please register at: ev.engie.co.uk
- Getting there
- Car Park Charges: Monday to Saturday 8am to 6pm Up to one hour 70p Up to two hours £1.40 Maximum stay three hours £2.10
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Church Green (GeniePoint)?
The listed price is completely free to charge until October 2021 / Please register at : ev.engie.co.uk. Prices can change, so check the price at the charger before you start.
How fast is charging at Church Green (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Church Green (GeniePoint) have?
1 charging socket: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Church Green?
Church Green is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Church Green (GeniePoint)?
Morrisons Keighley (GeniePoint) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Church Green (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Church Green (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Church Green (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.