Hubsta · EV charging site
Bradford Council, Keighley
Bronte Drive, Keighley, BD22 7LZ
Bradford Council, Keighley is an EV charging site in Keighley, Bradford, run by Hubsta. All 3 of its sockets are 7 kW Type 2, and the price is listed as 50p connection fee and around 20p kWh. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Morrisons Keighley (GeniePoint), 1.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Hubsta
- Opening hours
- Not published
- Access
- Customers only
- Price
- 50p connection fee and around 20p kWh.(from Open Charge Map, 4 Oct 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bradford Council, Keighley (Hubsta)?
The listed price is 50p connection fee and around 20p kWh.. Prices can change, so check the price at the charger before you start.
How fast is charging at Bradford Council, Keighley (Hubsta)?
Up to 7 kW AC via Type 2.
How many charging sockets does Bradford Council, Keighley (Hubsta) have?
3 charging sockets: 3 × 7 kW Type 2.
Who operates Bradford Council, Keighley?
Bradford Council, Keighley is on the Hubsta network.
Can anyone charge at Bradford Council, Keighley (Hubsta)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Bradford Council, Keighley (Hubsta)?
Morrisons Keighley (GeniePoint) is 1.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bradford Council, Keighley (Hubsta)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bradford Council, Keighley (Hubsta)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bradford Council, Keighley (Hubsta)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Risk Resolve Limited
- Oakworth Crematorium
- Gas St Car Park 1
- Morrisons Keighley
- Museum Car Park
- Church Green
- Fastest nearby
- Morrisons Keighley · 50 kW · 1.5 mi