GeniePoint · EV charging site
Morrisons Bodmin
Priory Road, Bodmin, PL31 2ST
Morrisons Bodmin is an EV charging site at Priory Road in Bodmin, Cornwall, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.35/kWh. Amp Map lists 1 other charge point named Morrisons Bodmin in Bodmin. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Bodmin (GeniePoint), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.35/kWh(from Open Charge Map, 28 Jul 2021)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Getting there
- £10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons Bodmin (GeniePoint)?
The listed price is £0.35/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons Bodmin (GeniePoint)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Morrisons Bodmin (GeniePoint) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2.
Who operates Morrisons Bodmin?
Morrisons Bodmin is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Bodmin (GeniePoint)?
Morrisons Bodmin (GeniePoint) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Bodmin (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Bodmin (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Bodmin (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Morrisons Bodmin
- Bodmin Retail Park
- IONITY GmbH IONITY Bodmin
- Bedknobs
- West End Motors Bodmin Business Park
- Berrycoombe Car Park
- Cheapest nearby
- IONITY GmbH IONITY Bodmin · 83.3p per kWh · 400 kW · 0.3 mi
- Fastest nearby
- IONITY GmbH IONITY Bodmin · 400 kW · 0.3 mi