GeniePoint · EV charging site
West End Motors Bodmin Business Park
Bodmin Business Park, PL31 2RJ
West End Motors Bodmin Business Park is an EV charging site in Bodmin, Cornwall, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is IONITY GmbH IONITY Bodmin, 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.35/kWh; £10.00 overstay after 65 mins(from Open Charge Map, 13 Aug 2021)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Getting there
- Just outside the fenced compound at West End Motors opposite SUEZ recycling centre
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at West End Motors Bodmin Business Park (GeniePoint)?
The listed price is £0.35/kWh; £10.00 overstay after 65 mins. Prices can change, so check the price at the charger before you start.
How fast is charging at West End Motors Bodmin Business Park (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does West End Motors Bodmin Business Park (GeniePoint) have?
1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates West End Motors Bodmin Business Park?
West End Motors Bodmin Business Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to West End Motors Bodmin Business Park (GeniePoint)?
IONITY GmbH IONITY Bodmin is 0.3 miles away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at West End Motors Bodmin Business Park (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at West End Motors Bodmin Business Park (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at West End Motors Bodmin Business Park (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- IONITY GmbH IONITY Bodmin
- Bodmin Retail Park
- Morrisons Bodmin
- Morrisons Bodmin
- Bedknobs
- Berrycoombe Car Park
- Cheapest nearby
- IONITY GmbH IONITY Bodmin · 83.3p per kWh · 400 kW · 0.3 mi
- Fastest nearby
- IONITY GmbH IONITY Bodmin · 400 kW · 0.3 mi