GeniePoint · EV charging site
Morrisons Skipton
Broughton Road, Keighley, BD23 1RT
Morrisons Skipton is an EV charging site in Keighley, Bradford, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bridge Street Car Park, Skipton (Osprey Charging), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Rapid ( £1 fee + 30p per kw ) AC is a 22kw Socket ( 50p fee + 30 per per Kw )(from Open Charge Map, 4 Oct 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- £10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons Skipton (GeniePoint)?
The listed price is Rapid ( £1 fee + 30p per kw ) AC is a 22kw Socket ( 50p fee + 30 per per Kw ). Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons Skipton (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Morrisons Skipton (GeniePoint) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Morrisons Skipton?
Morrisons Skipton is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Skipton (GeniePoint)?
Bridge Street Car Park, Skipton (Osprey Charging) is 0.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Skipton (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Skipton (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Skipton (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bridge Street Car Park, Skipton
- Pod Point Tesco Superstore - Skipton
- Skipton High Street Car Park, Skipton
- Pod Point Bowman Riley, Architects, Building Consultants & Interior Designers
- Pod Point King Cole Ltd
- Pickersgill Manor Farm Bed and Breakfast
- Cheapest nearby
- Pod Point Bowman Riley, Architects, Building Consultants & Interior Designers · 27.6p per kWh · 7 kW · 0.4 mi
- Fastest nearby
- Bridge Street Car Park, Skipton · 75 kW · 0.2 mi