GeniePoint · EV charging site
Timber Street Car Park
Huddersfield Road, Elland, HX5 0ER
Timber Street Car Park is an EV charging site in Elland, Calderdale, run by GeniePoint. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Morrisons Elland (GeniePoint), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Completely free to use until October 2021(from Open Charge Map, 4 Oct 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- Engie rapid charger, 50kW DC, AC is a 22kW Socket. One bay for general use, one bay for taxis. Both Free to charge. Please register at : ev.engie.co.uk
- Getting there
- Parking Fees may Apply Mon-Sat 08:00 - 18:00 Up to 1 hour £0.40 Up to 2 hours £0.80 Up to 3 hours £1.20 Up to 4 hours £1.60 Up to 5 hours £2.00 Up to 6 hours £2.40
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Timber Street Car Park (GeniePoint)?
The listed price is Completely free to use until October 2021. Prices can change, so check the price at the charger before you start.
How fast is charging at Timber Street Car Park (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Timber Street Car Park (GeniePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Timber Street Car Park?
Timber Street Car Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Timber Street Car Park (GeniePoint)?
Morrisons Elland (GeniePoint) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Timber Street Car Park (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Timber Street Car Park (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Timber Street Car Park (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.