Tonik Energy · EV charging site
Civic Offices
Euclid Street, Swindon, SN2 2PN
Civic Offices is an EV charging site in Swindon, Borough of Swindon, run by Tonik Energy. Both of its sockets are 22 kW Type 2, and the price is listed as £0.30/kWh. 21 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Colbourne Street (InstaVolt Ltd), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Tonik Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.30/kWh(from Open Charge Map, 7 Feb 2020)
- Getting there
- Mobile phone app or rfid access
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Civic Offices (Tonik Energy)?
The listed price is £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Civic Offices (Tonik Energy)?
Up to 22 kW AC via Type 2.
How many charging sockets does Civic Offices (Tonik Energy) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Civic Offices?
Civic Offices is on the Tonik Energy network.
Where is the nearest charger with 50 kW or more to Civic Offices (Tonik Energy)?
Colbourne Street (InstaVolt Ltd) is 0.6 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Civic Offices (Tonik Energy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Civic Offices (Tonik Energy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Civic Offices (Tonik Energy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.