Tonik Energy · EV charging site
Wat Tyler House - Parking Bays 118 & 119
Beckhampton Street, Swindon, SN2 2PN
Wat Tyler House - Parking Bays 118 & 119 is an EV charging site in Swindon, Borough of Swindon, run by Tonik Energy. Both of its sockets are 7 kW Type 2, and the price is listed as £0.30/kWh. 21 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Colbourne Street (InstaVolt Ltd), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Tonik Energy
- Opening hours
- Not published
- Access
- Public
- Price
- £0.30/kWh(from Open Charge Map, 22 Aug 2019)
- Getting there
- Access available from 6am - 8pm Monday - Friday.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy)?
The listed price is £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy)?
Up to 7 kW AC via Type 2.
How many charging sockets does Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Wat Tyler House - Parking Bays 118 & 119?
Wat Tyler House - Parking Bays 118 & 119 is on the Tonik Energy network.
Where is the nearest charger with 50 kW or more to Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy)?
Colbourne Street (InstaVolt Ltd) is 0.6 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Civic Offices · 22 kW · 80 yd