Total Energies · EV charging site
Bernard Street
21 Bernard Street, Soho, WC1N 1LN
Bernard Street is an EV charging site in Soho, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 183 other charging sites are listed within a mile, and the nearest site with 50 kW or more is (Taxis Only) Russell Square (North West side) (ESB Energy), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 20 Feb 2026)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bernard Street (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Bernard Street (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Bernard Street (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Bernard Street?
Bernard Street is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Bernard Street (Total Energies)?
(Taxis Only) Russell Square (North West side) (ESB Energy) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bernard Street (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bernard Street (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bernard Street (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Herbrand Street
- Pod Point Imperial Hotels - The President
- Pod Point Imperial Hotels - Royal National Hotel
- ubitricity Distributed Energy Systems UK Ltd. 38 Bedford Way, o/s university
- ubitricity Distributed Energy Systems UK Ltd. 23 Great Ormond Street
- (Taxis Only) Russell Square (North West side)
- Cheapest nearby
- Pod Point Imperial Hotels - The President · 15.6p per kWh · 22 kW · 140 yd
- Fastest nearby
- (Taxis Only) Russell Square (North West side) · 50 kW · 0.2 mi