Total Energies · EV charging site
Herbrand Street
9 Herbrand Street, Soho, WC1N 1LB
Herbrand Street is an EV charging site in Soho, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 194 other charging sites are listed within a mile, and the nearest site with 50 kW or more is (Taxis Only) Russell Square (North West side) (ESB Energy), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 17 Aug 2025)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Herbrand Street (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Herbrand Street (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Herbrand Street (Total Energies) have?
1 charging socket: 1 × 4 kW J-1772, 1 × 7 kW Type 2.
Who operates Herbrand Street?
Herbrand Street is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Herbrand Street (Total Energies)?
(Taxis Only) Russell Square (North West side) (ESB Energy) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Herbrand Street (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Herbrand Street (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Herbrand Street (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bernard Street
- Pod Point Imperial Hotels - The President
- ubitricity Distributed Energy Systems UK Ltd. 38 Bedford Way, o/s university
- Pod Point Imperial Hotels - Royal National Hotel
- (Taxis Only) Russell Square (North West side)
- Ypml Lynton House 1
- Cheapest nearby
- Pod Point Imperial Hotels - The President · 15.6p per kWh · 22 kW · 140 yd
- Fastest nearby
- (Taxis Only) Russell Square (North West side) · 50 kW · 0.1 mi