Total Energies · EV charging site
Bina Gardens
11 Bina Gardens, Chelsea, SW5 0JR
Bina Gardens is an EV charging site in Chelsea, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 22 kW. 539 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Kensington Road,Kensington (ESB Energy), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 12 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bina Gardens (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Bina Gardens (Total Energies)?
Up to 22 kW AC via Type 2, J-1772.
How many charging sockets does Bina Gardens (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772, 1 × 22 kW Type 2.
Who operates Bina Gardens?
Bina Gardens is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Bina Gardens (Total Energies)?
Kensington Road,Kensington (ESB Energy) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bina Gardens (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bina Gardens (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bina Gardens (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 40 Ashburn Place
- ubitricity Distributed Energy Systems UK Ltd. 37 Rosary Gardens
- ubitricity Distributed Energy Systems UK Ltd. 36 Rosary Gardens
- ubitricity Distributed Energy Systems UK Ltd. 13 Harrington Gardens
- ubitricity Distributed Energy Systems UK Ltd. 9 Rosary Gardens, opp.
- ubitricity Distributed Energy Systems UK Ltd. 15 Hereford Square
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 40 Ashburn Place · 56p per kWh · 5 kW · 60 yd