Total Energies · EV charging site
Bowling Green Lane
10 Bowling Green Lane, Islington, EC1R 0BB
Bowling Green Lane is an EV charging site in Islington, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 149 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 17 Meredith Street (ESB Energy), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 21 Nov 2018)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bowling Green Lane (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Bowling Green Lane (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Bowling Green Lane (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Bowling Green Lane?
Bowling Green Lane is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Bowling Green Lane (Total Energies)?
17 Meredith Street (ESB Energy) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bowling Green Lane (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bowling Green Lane (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bowling Green Lane (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Britton Street
- 17 Meredith Street
- Attneave Street
- Gloucester Way, Clerkenwell
- ubitricity Distributed Energy Systems UK Ltd. 9 Hardwick Street, opp The Remus Building
- ubitricity Distributed Energy Systems UK Ltd. 10 Wyclif Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 9 Hardwick Street, opp The Remus Building · 56p per kWh · 5 kW · 0.2 mi
- Fastest nearby
- 17 Meredith Street · 50 kW · 0.2 mi