Total Energies · EV charging site
Brittania Street
47 Brittania Street, Islington, WC1X 9JH
Brittania Street is an EV charging site in Islington, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 179 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Gloucester Way, Clerkenwell (ESB Energy), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 7 Jun 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Brittania Street (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Brittania Street (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Brittania Street (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Brittania Street?
Brittania Street is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Brittania Street (Total Energies)?
Gloucester Way, Clerkenwell (ESB Energy) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Brittania Street (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Brittania Street (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Brittania Street (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 70 Acton Street
- Crestfield Street, Camden
- ubitricity Distributed Energy Systems UK Ltd. 2 Killick Street
- ubitricity Distributed Energy Systems UK Ltd. Killick Street
- Harrison Street
- ubitricity Distributed Energy Systems UK Ltd. Killick Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 2 Killick Street · 56p per kWh · 5 kW · 0.1 mi
- Fastest nearby
- Harrison Street · 22 kW · 0.2 mi