Total Energies · EV charging site
Burnt Ash Lane Car Park
Burnt Ash Lane (Bromley) Car Park, Chislehurst, BR1 5FA
Burnt Ash Lane Car Park is an EV charging site in Chislehurst, Greater London, run by Total Energies. Its 4 sockets reach up to 7 kW, with Type 2 at the top speed. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Nichol Lane (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 16 Jun 2017)
- Getting there
- Free parking.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Burnt Ash Lane Car Park (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Burnt Ash Lane Car Park (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Burnt Ash Lane Car Park (Total Energies) have?
4 charging sockets: 4 × 7 kW Type 2, 4 × 4 kW J-1772.
Who operates Burnt Ash Lane Car Park?
Burnt Ash Lane Car Park is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Burnt Ash Lane Car Park (Total Energies)?
Nichol Lane (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Burnt Ash Lane Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Burnt Ash Lane Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Burnt Ash Lane Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Toyota Bromley
- Nichol Lane
- ubitricity Distributed Energy Systems UK Ltd. 624 Downham Way, opp.
- 2 Riddons Road
- Outside 24-26 Bromley Hill
- ubitricity Distributed Energy Systems UK Ltd. 24 Coniston Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 624 Downham Way, opp. · 45p per kWh · 5 kW · 0.7 mi
- Fastest nearby
- Nichol Lane · 50 kW · 0.4 mi