Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Total Energies · EV charging site

Burnt Ash Lane Car Park

Burnt Ash Lane (Bromley) Car Park, Chislehurst, BR1 5FA

Burnt Ash Lane Car Park is an EV charging site in Chislehurst, Greater London, run by Total Energies. Its 4 sockets reach up to 7 kW, with Type 2 at the top speed. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Nichol Lane (BP Pulse), 0.4 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 16 Jun 2017Last verified 16 Jun 2017

Connectors

Type 2 · 7 kW4 connectors
J-1772 · 4 kW4 connectors

Site information

Opening hours
Not published
Access
Public · membership required · access key required
Price
£0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 16 Jun 2017)
Getting there
Free parking.

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Burnt Ash Lane Car Park (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

How fast is charging at Burnt Ash Lane Car Park (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

How many charging sockets does Burnt Ash Lane Car Park (Total Energies) have?

4 charging sockets: 4 × 7 kW Type 2, 4 × 4 kW J-1772.

Who operates Burnt Ash Lane Car Park?

Burnt Ash Lane Car Park is on the Total Energies network.

Where is the nearest charger with 50 kW or more to Burnt Ash Lane Car Park (Total Energies)?

Nichol Lane (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Burnt Ash Lane Car Park (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Burnt Ash Lane Car Park (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Burnt Ash Lane Car Park (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 16 Jun 2017

Amp Map does not take payment. You pay the operator.