Total Energies · EV charging site
Chatterton Road
47 Chatterton Road, Hayes, BR2 9QG
Chatterton Road is an EV charging site in Hayes, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London, UK - Bromley (Tesla), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 10 Jan 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Chatterton Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Chatterton Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Chatterton Road (Total Energies) have?
2 charging sockets: 1 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Chatterton Road?
Chatterton Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Chatterton Road (Total Energies)?
London, UK - Bromley (Tesla) is 1.1 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Chatterton Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chatterton Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Chatterton Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Superstore - Bromley
- Pod Point Bickley Railway Station (SE Trains)
- Elmfield Park Road
- Bromley NCP - The Mall
- Civic Centre Car Park (Stockwell Close)
- Bromley Civic Centre Car Park
- Cheapest nearby
- Pod Point Tesco Superstore - Bromley · 44.4p per kWh · 7 kW · 0.6 mi
- Fastest nearby
- Elmfield Park Road · 22 kW · 0.9 mi