Total Energies · EV charging site
Crescent Wood Road (2)
1 Crescent Wood Road (2), Perry Vale, SE26 6RS
Crescent Wood Road (2) is an EV charging site in Perry Vale, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 75 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 232-236 Gipsy Rd, 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 10 Jan 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Crescent Wood Road (2) (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Crescent Wood Road (2) (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Crescent Wood Road (2) (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2.
Who operates Crescent Wood Road (2)?
Crescent Wood Road (2) is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Crescent Wood Road (2) (Total Energies)?
232-236 Gipsy Rd is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Crescent Wood Road (2) (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Crescent Wood Road (2) (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Crescent Wood Road (2) (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.