Total Energies · EV charging site
Erconwald Street
Erconwald Street, Willesden, W12 0BP
Erconwald Street is an EV charging site in Willesden, Greater London (W12 0BP), run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 1 other charge point named Erconwald Street in Willesden. 600 other charging sites are listed within a mile, and the nearest site with 50 kW or more is White City (Chargemaster), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 6 Mar 2018)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Erconwald Street (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Erconwald Street (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Erconwald Street (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Erconwald Street?
Erconwald Street is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Erconwald Street (Total Energies)?
White City (Chargemaster) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Erconwald Street (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Erconwald Street (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Erconwald Street (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 69 Erconwald Street
- ubitricity Distributed Energy Systems UK Ltd. 75 Erconwald Street, Outside 75
- ubitricity Distributed Energy Systems UK Ltd. 42 Henchman Street
- ubitricity Distributed Energy Systems UK Ltd. 45 Fitzneal Street
- ubitricity Distributed Energy Systems UK Ltd. 54 Henchmen Street, Outside No 54
- ubitricity Distributed Energy Systems UK Ltd. 31 Fitzneal Street, Outside 31
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 69 Erconwald Street · 56p per kWh · 5 kW · 40 yd