Total Energies · EV charging site
Golden Square
33 Golden Square, Soho, W1F 9JT
Golden Square is an EV charging site in Soho, Greater London, run by Total Energies. It has a single 22 kW Type 2 socket. 292 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Masterpark Chinatown Car Park (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 7 Oct 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Golden Square (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Golden Square (Total Energies)?
Up to 22 kW AC via Type 2.
How many charging sockets does Golden Square (Total Energies) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates Golden Square?
Golden Square is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Golden Square (Total Energies)?
Masterpark Chinatown Car Park (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Golden Square (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Golden Square (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Golden Square (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 59 Brewer Street
- NCP Brewer Street - Chargepost 1
- Broadwick Road Carpark
- ubitricity Distributed Energy Systems UK Ltd. 15 Savile Row
- ubitricity Distributed Energy Systems UK Ltd. 19 Clifford Street, Junc. Savile Row
- ubitricity Distributed Energy Systems UK Ltd. 49 Great Marlborough Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 59 Brewer Street · 67p per kWh · 5 kW · 150 yd