Total Energies · EV charging site
Gorringe Park
46 Gorringe Park Avenue, Tooting, CR4 2DH
Gorringe Park is an EV charging site in Tooting, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 260 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 21 High Street, 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 9 Jun 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Gorringe Park (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Gorringe Park (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Gorringe Park (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Gorringe Park?
Gorringe Park is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Gorringe Park (Total Energies)?
21 High Street is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Gorringe Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gorringe Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Gorringe Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 50 Heaton Road
- ubitricity Distributed Energy Systems UK Ltd. Road Tynemouth, Junction With Gorringe Park A
- 30 - 32 Bruce Road
- ubitricity Distributed Energy Systems UK Ltd. Road Pitcairn, Junction With London Road
- 50 Inglemere Road
- Thirsk Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Tynemouth, Junction With Gorringe Park A · 67p per kWh · 5 kW · 90 yd