Total Energies · EV charging site
Gransden Avenue
26 Gransden Avenue, Bethnal Green, E8 3QA
Gransden Avenue is a planned EV charging site in Bethnal Green, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 212 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hackney Council Service Centre (GeniePoint), 0.3 miles away.
Status
Coming soon
Listed as coming soon. Check before you travel.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.036/minute; min £0.72(from Open Charge Map, 6 Jan 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Gransden Avenue (Total Energies)?
The listed price is £0.036/minute; min £0.72. Prices can change, so check the price at the charger before you start.
How fast is charging at Gransden Avenue (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Gransden Avenue (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Gransden Avenue?
Gransden Avenue is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Gransden Avenue (Total Energies)?
Hackney Council Service Centre (GeniePoint) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Gransden Avenue (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gransden Avenue (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Gransden Avenue (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bocking Street
- Hackney Council Service Centre
- Hackney Council Service Centre
- Clermont Road
- Victoria Park Road
- ubitricity Distributed Energy Systems UK Ltd. 116A Albion Drive
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 116A Albion Drive · 45p per kWh · 5 kW · 0.4 mi
- Fastest nearby
- Hackney Council Service Centre · 50 kW · 0.3 mi