Total Energies · EV charging site
Hammersmith Grove
Hammersmith Grove, Shepherds Bush, W6 7EL
Hammersmith Grove is an EV charging site in Shepherds Bush, Greater London (W6 7EL), run by Total Energies. Its 4 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 9 other charge points named Hammersmith Grove in Shepherds Bush. 1,612 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Rowan Road (Opp no. 5) (ESB Energy), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 8 Nov 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Hammersmith Grove (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Hammersmith Grove (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Hammersmith Grove (Total Energies) have?
4 charging sockets: 4 × 7 kW Type 2, 4 × 4 kW J-1772.
Who operates Hammersmith Grove?
Hammersmith Grove is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Hammersmith Grove (Total Energies)?
Rowan Road (Opp no. 5) (ESB Energy) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hammersmith Grove (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hammersmith Grove (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hammersmith Grove (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Richford Street, Side 188 Hammersmith Grove
- ubitricity Distributed Energy Systems UK Ltd. 192-194 Hammersmith Grove, O S 192 194
- ubitricity Distributed Energy Systems UK Ltd. Street Richford, Junction With Grove Mews
- Beauclerc Road
- ubitricity Distributed Energy Systems UK Ltd. 173-175 Hammersmith Grove, On W F Way O S No1
- Hammersmith Grove
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Richford Street, Side 188 Hammersmith Grove · 67p per kWh · 5 kW · 10 yd