Total Energies · EV charging site
NCP Aldersgate
158-170 Aldersgate Street, Islington, EC1A 4HY
NCP Aldersgate is an EV charging site in Islington, Greater London, run by Total Energies. All 4 of its sockets are 4 kW Type 2. 112 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Monta PnC test team, 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free. Parking fees apply.(from Open Charge Map, 24 Apr 2019)
- Phone (from Open Charge Map)
- 0845 850 0653
- Notes
- Chargemaster posts. Polar Network cards accepted as well as Source London.
- Getting there
- On level 2. Max Height - 1.98m
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at NCP Aldersgate (Total Energies)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at NCP Aldersgate (Total Energies)?
Up to 4 kW AC via Type 2.
How many charging sockets does NCP Aldersgate (Total Energies) have?
4 charging sockets: 4 × 4 kW Type 2.
Who operates NCP Aldersgate?
NCP Aldersgate is on the Total Energies network. For site issues, the operator lists 0845 850 0653.
Where is the nearest charger with 50 kW or more to NCP Aldersgate (Total Energies)?
Monta PnC test team is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at NCP Aldersgate (Total Energies)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NCP Aldersgate (Total Energies)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at NCP Aldersgate (Total Energies)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Smithfield Market Car Park
- West Smithfield Car Park
- Saint John Street 29
- Pod Point Stephen Grimwood Electrical Ltd
- Baynard House Car Park
- Cowcross Street
- Cheapest nearby
- Pod Point Stephen Grimwood Electrical Ltd · 39.6p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- Smithfield Market Car Park · 7 kW · 0.2 mi