Total Energies · EV charging site
Opposite 75 Stevenage Road
Opposite 75 Stevenage Road, Fulham, SW6 6PF
Opposite 75 Stevenage Road is a planned EV charging site in Fulham, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 1,166 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Fulham, 0.6 miles away.
Status
Coming soon
Listed as coming soon. Check before you travel.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.036/minute; min £0.72(from Open Charge Map, 23 Nov 2016)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Opposite 75 Stevenage Road (Total Energies)?
The listed price is £0.036/minute; min £0.72. Prices can change, so check the price at the charger before you start.
How fast is charging at Opposite 75 Stevenage Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Opposite 75 Stevenage Road (Total Energies) have?
3 charging sockets: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Opposite 75 Stevenage Road?
Opposite 75 Stevenage Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Opposite 75 Stevenage Road (Total Energies)?
Shell Recharge Shell Fulham is 0.6 miles away in a straight line, with up to 175 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Opposite 75 Stevenage Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Opposite 75 Stevenage Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Opposite 75 Stevenage Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Stevenage Road
- ubitricity Distributed Energy Systems UK Ltd. 86 Inglethorpe Street, Outside 86
- Inglethorpe Street
- ubitricity Distributed Energy Systems UK Ltd. 148 Harbord Street, Outside 148
- ubitricity Distributed Energy Systems UK Ltd. Road Stevenage, Opposite Harbord Street
- ubitricity Distributed Energy Systems UK Ltd. 126 Harbord Street, Outside 126
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 86 Inglethorpe Street, Outside 86 · 56p per kWh · 5 kW · 80 yd