Total Energies · EV charging site
Stevenage Road
Opposite 75 Stevenage Road, Fulham, SW6 6NP
Stevenage Road is an EV charging site at Opposite 75 Stevenage Road in Fulham, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 3 other charge points named Stevenage Road in Fulham. 1,139 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Fulham, 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 23 Jul 2018)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Stevenage Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Stevenage Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Stevenage Road (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Stevenage Road?
Stevenage Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Stevenage Road (Total Energies)?
Shell Recharge Shell Fulham is 0.6 miles away in a straight line, with up to 175 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Stevenage Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stevenage Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Stevenage Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Road Stevenage, Opposite Harbord Street
- ubitricity Distributed Energy Systems UK Ltd. 148 Harbord Street, Outside 148
- Opposite 75 Stevenage Road
- ubitricity Distributed Energy Systems UK Ltd. 126 Harbord Street, Outside 126
- Harbord Street
- ubitricity Distributed Energy Systems UK Ltd. 86 Inglethorpe Street, Outside 86
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Stevenage, Opposite Harbord Street · 56p per kWh · 5 kW · 40 yd