Total Energies · EV charging site
Park Avenue
11 Park Avenue Southall, UB1 3AQ
Park Avenue is an EV charging site in Southall, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 28 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's Hanwell (InstaVolt Ltd), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 7 Oct 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Park Avenue (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Park Avenue (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Park Avenue (Total Energies) have?
3 charging sockets: 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Park Avenue?
Park Avenue is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Park Avenue (Total Energies)?
McDonald's Hanwell (InstaVolt Ltd) is 0.9 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Park Avenue (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Park Avenue (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Park Avenue (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Oswald Road
- Grange Road
- Park View Road
- Featherstone Terrace Car Park
- ubitricity Distributed Energy Systems UK Ltd. 33 Church Road
- ubitricity Distributed Energy Systems UK Ltd. 5 Gladstone Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 33 Church Road · 56p per kWh · 5 kW · 0.4 mi
- Fastest nearby
- Oswald Road · 22 kW · 0.3 mi