Total Energies · EV charging site
Severus Road
1 Severus Road, Latchmere, SW11 1PL
Severus Road is an EV charging site in Latchmere, Greater London, run by Total Energies. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed. 250 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Limburg Road, A3 Battersea Rise (ESB Energy), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 7 Oct 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Severus Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Severus Road (Total Energies)?
Up to 22 kW AC via Type 2, J-1772.
How many charging sockets does Severus Road (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772, 1 × 22 kW Type 2.
Who operates Severus Road?
Severus Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Severus Road (Total Energies)?
Limburg Road, A3 Battersea Rise (ESB Energy) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Severus Road (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Severus Road (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Severus Road (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 28 Comyn Road London England SW11 1QD GB
- ubitricity Distributed Energy Systems UK Ltd. opp 49 Comyn Road London
- Comyn Road
- Grant Road
- Limburg Road, A3 Battersea Rise
- Bolingbroke Grove
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 28 Comyn Road London England SW11 1QD GB · 67p per kWh · 5 kW · 0.1 mi
- Fastest nearby
- Limburg Road, A3 Battersea Rise · 50 kW · 0.2 mi