Total Energies · EV charging site
South Hill Road
2 South Hill Road, Hayes, BR2 0RA
South Hill Road is an EV charging site in Hayes, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London, UK - Bromley (Tesla), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 22 Jun 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at South Hill Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at South Hill Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does South Hill Road (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates South Hill Road?
South Hill Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to South Hill Road (Total Energies)?
London, UK - Bromley (Tesla) is 0.9 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at South Hill Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at South Hill Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at South Hill Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Elmfield Park Road
- Bromley NCP - The Mall
- Valley Road
- The Glades Shopping Centre
- Hill Car Park(Site 2)
- The Hill Multi-storey Car Park
- Fastest nearby
- Elmfield Park Road · 22 kW · 0.7 mi