Total Energies · EV charging site
St Marks Gate
Opposite 1 St Marks Gate, Bow, E9 5HT
St Marks Gate is an EV charging site in Bow, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 286 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's Bow (InstaVolt Ltd), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at St Marks Gate (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at St Marks Gate (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does St Marks Gate (Total Energies) have?
3 charging sockets: 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2.
Who operates St Marks Gate?
St Marks Gate is on the Total Energies network.
Where is the nearest charger with 50 kW or more to St Marks Gate (Total Energies)?
McDonald's Bow (InstaVolt Ltd) is 0.9 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at St Marks Gate (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St Marks Gate (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at St Marks Gate (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 116 Cadogan Terrace
- Jodrell Road
- ubitricity Distributed Energy Systems UK Ltd. 86 Cadogan Terrace, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 79 Cadogan Terrace, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 48 Wyke Road
- ubitricity Distributed Energy Systems UK Ltd. 40 Wyke Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 116 Cadogan Terrace · 55p per kWh · 5 kW · 70 yd