Total Energies · EV charging site
The Avenue
25 the Avenue Wood Green, Harringay, N8 0JR
The Avenue is an EV charging site in Harringay, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 31 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Avenue (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at The Avenue (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does The Avenue (Total Energies) have?
3 charging sockets: 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2.
Who operates The Avenue?
The Avenue is on the Total Energies network.
Where is the nearest charger with 50 kW or more to The Avenue (Total Energies)?
[E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Avenue (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Avenue (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Avenue (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- High Road Wood Green 20
- Bury Road Car Park
- West Green Road 526
- The Mall Wood Green Car Park
- The Mall Wood Green East
- Tottenham Lane
- Fastest nearby
- High Road Wood Green 20 · 22 kW · 0.2 mi