Total Energies · EV charging site
The Crystal Car Park
Western Gateway, Canning Town, E16 1GB
The Crystal Car Park is an EV charging site in Canning Town, Greater London, run by Total Energies. It has a single socket, with CHAdeMO at up to 50 kW. 47 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Newham Way Connect (BP Pulse), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free. Parking fees apply.(from Open Charge Map, 23 Mar 2017)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Crystal Car Park (Total Energies)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at The Crystal Car Park (Total Energies)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does The Crystal Car Park (Total Energies) have?
1 charging socket: 1 × 50 kW CHAdeMO, 2 × 22 kW Type 2.
Who operates The Crystal Car Park?
The Crystal Car Park is on the Total Energies network.
Where is the nearest other charger with 50 kW or more to The Crystal Car Park (Total Energies)?
Newham Way Connect (BP Pulse) is 0.7 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Crystal Car Park (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Crystal Car Park (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Crystal Car Park (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Crowne Plaza London
- DRAX00230
- Wesley Avenue
- Excel (london International Exhibition Centre)
- ubitricity Distributed Energy Systems UK Ltd. 31 Hartington Road
- Pod Point Greenwich 1905
- Cheapest nearby
- Pod Point Greenwich 1905 · Free · 7 kW · 0.7 mi