Total Energies · EV charging site
Wesley Avenue
Wesley Avenue, Canning Town, E16 1SW
Wesley Avenue is an EV charging site in Canning Town, Greater London, run by Total Energies. Both of its sockets are 7 kW Type 2, and charging is listed as free. 18 other charging sites are listed within a mile, and the nearest site with 50 kW or more is The Crystal Car Park (Total Energies), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 12 Nov 2016)
- Notes
- Pod-Point charging point.
- Getting there
- Max 4 hours stay while charging, no return within 2 hours
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Wesley Avenue (Total Energies)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Wesley Avenue (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does Wesley Avenue (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Wesley Avenue?
Wesley Avenue is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Wesley Avenue (Total Energies)?
The Crystal Car Park (Total Energies) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wesley Avenue (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wesley Avenue (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wesley Avenue (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- DRAX00230
- Crowne Plaza London
- The Crystal Car Park
- Excel (london International Exhibition Centre)
- ubitricity Distributed Energy Systems UK Ltd. 31 Hartington Road
- Pod Point Greenwich 1905
- Cheapest nearby
- Pod Point Greenwich 1905 · Free · 7 kW · 0.7 mi
- Fastest nearby
- The Crystal Car Park · 50 kW · 0.3 mi