Total Energies · EV charging site
Watford Road
Opposite 32a Watford Road, Brent, HA0 3ER
Watford Road is an EV charging site in Brent, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 32 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 4-5 Glenmore Parade, 1.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Watford Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Watford Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Watford Road (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Watford Road?
Watford Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Watford Road (Total Energies)?
4-5 Glenmore Parade is 1.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Watford Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Watford Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Watford Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 13 Rugby Avenue
- ubitricity Distributed Energy Systems UK Ltd. 18 Charterhouse Avenue
- ubitricity Distributed Energy Systems UK Ltd. 31 Charterhouse Avenue
- ubitricity Distributed Energy Systems UK Ltd. 6 Saint Andrews Avenue
- ubitricity Distributed Energy Systems UK Ltd. 31 Saint Andrews Avenue
- ubitricity Distributed Energy Systems UK Ltd. 96 Fernbank Avenue
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 13 Rugby Avenue · 56p per kWh · 5 kW · 0.1 mi