Total Energies · EV charging site
Wroughton Road
Opposite 67 Wroughton Road, Latchmere, SW11 6AS
Wroughton Road is an EV charging site in Latchmere, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 189 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Limburg Road, A3 Battersea Rise (ESB Energy), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 7 Oct 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Wroughton Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Wroughton Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Wroughton Road (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Wroughton Road?
Wroughton Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Wroughton Road (Total Energies)?
Limburg Road, A3 Battersea Rise (ESB Energy) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wroughton Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wroughton Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wroughton Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Webbs Road
- ubitricity Distributed Energy Systems UK Ltd. 80 Hillier Road, junc. Broomwood Road
- ubitricity Distributed Energy Systems UK Ltd. 70 Hillier Road
- ubitricity Distributed Energy Systems UK Ltd. 56 Chatto Road
- Ballingdon Road
- ubitricity Distributed Energy Systems UK Ltd. 72 Chatto Road, Junc. Wisley Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 80 Hillier Road, junc. Broomwood Road · 67p per kWh · 5 kW · 100 yd
- Fastest nearby
- Ballingdon Road · 22 kW · 160 yd